The next Region 4 Sabine-RFPG meeting is scheduled for December 4, 2023 at 2:00pm. More information can be found at https://www.sabine-rfpg.org/
Holiday Recreation Area on Lake Tawakoni Reservoir Opened
(Lake Tawakoni Reservoir, Texas) The Sabine River Authority of Texas (SRA) recently opened the Holiday Recreation Area on Lake Tawakoni. The facility is located along Highway 47 in Van Zandt County near the west end of the Iron Bridge Dam. The new Holiday Recreation Area includes a pavilion, three-lane boat ramp, and public parking, to accommodate local and national fishing …
Public Notice: Flood Infrastructure Fund Meeting Upper Sabine Study- Public Meeting #3
PUBLIC NOTICE Flood Infrastructure Fund (FIF) Upper Sabine Study – Public Meeting #3 November 7, 2023 at 5:30 PM (Longview, Texas) Notice is hereby given that the Sabine River Authority of Texas (SRATX) has set up a meeting for public review and comment of the progress for the Upper Sabine Flood Infrastructure (FIF) Project. The public comment meeting will be …
SRA Dedication Ceremony Held for Caney Point Recreation Area on Lake Fork Reservoir
(Lake Fork Reservoir, Texas) The Sabine River Authority of Texas (SRA) recently held a dedication ceremony to open the Caney Point Recreation Area. The facility is located west of Hwy 154 in Wood County near Caney Creek and is part of SRA’s economic development program to enhance recreational opportunities throughout the Sabine River Basin, fulfilling SRA’s obligation to assist in …
RFP 24-001E Engineering Services related to FERC Comprehensive Assessment
Please download RFP 24-001E Engineering Services related to FERC Comprehensive Assessment bid documents. https://www.sratx.org/about/forms/#doing-business Notice to Respondents RFP 24-001 FERC 18 CFR Part 12.pdf RFP 24-001E Engineering Services related to FERC Comprehensive Assessment.pdf
Sunset Advisory Commission Invites Public Input on the Sabine River Authority
Sunset Advisory Commission Invites Public Input on the Sabine River Authority The Sunset Advisory Commission is reviewing the mission and performance of the Sabine River Authority (SRA) and welcomes public comments on ideas to improve its operations and services. The Texas Sunset Act requires the Sunset Commission to periodically review SRA and recommend changes in operations or state law to improve …
RFB 23-1210 TBD N Bayou Rd. & Bayou Fork Rd. Roadway and Drainage Improvements
Please download RFB 23-1210 TBD N Bayou Rd. & Bayou Fork Rd. Roadway and Drainage Improvements bid documents. https://www.sratx.org/about/forms/#doing-business RFB 23-1210 TBD N Bayou Rd. & Bayou Fork Rd. Roadway and Drainage Improvements Notice to Bid.pdf RFB 23-1210 TBD N Bayou Rd. & Bayou Fork Rd. Roadway and Drainage Improvements Contract Documents.pdf RFB 23-1210 TBD N Bayou Rd. & Bayou Fork Rd. Roadway and …
Sabine River Authority Board of Directors Meeting 10/12/23
The Sabine River Authority of Texas Board of Directors met Thursday, Ocotber 12, 2023, at 9:00 am in Quitman, TX. See Texas Secretary of State Open Meeting TRD=20223005699 for the specific location and the full agenda.
RFB 24-0201 GCD Wynn Siphon Project
Please download RFB 24-0201 GCD Wynn Siphon Project bid documents. https://www.sratx.org/about/forms/#doing-business RFB 24-0201 GCD E Wynn Complete Documents.pdf RFB 24-0201 GCD E Wynn Siphon Replacement.pdf RFB 24-0201 Addendum 1.pdf
RFB 24-1201 TBD Underwater Stump Removal
Please download RFB 24-1201 TBD Underwater Stump Removal bid documents. https://www.sratx.org/about/forms/#doing-business RFB 24-1201 TBD Underwater Stump Removal NTB.pdf RFB 24-1201 TBD Underwater Stump Removal.pdf RFB 24-1201 FY24 Proposed Cutting Area Locations.pdf RFB 24-1201 FY24 Proposed Stump Removal Addenda No. 1.pdf