Advisory # 4 Saturday May 20, 2023 EVENT OVER-OPERATIONS BACK TO NORMAL TOLEDO BEND RESERVOIR – WATER RELEASES AS OF TIME: 2115hrs RESERVOIR ELEV: 172.00 FT. MSL SPILLWAY RELEASES HAVE CHANGED FROM 5,000 cfs TO 300 cfs IN ACCORDANCE WITH THE GUIDE FOR SPILLWAY GATE OPERATIONS IN THE LICENSE APPROVED BY FERC FOR TOLEDO BEND RESERVOIR, CURRENT RELEASES ARE …
Toledo Bend Reservoir Advisory #3 May 15, 2023
Download Advisory # 3 TOLEDO BEND RESERVOIR – WATER RELEASES AS OF TIME: 15:30 hrs RESERVOIR ELEV: 172.50 FT. MSL SPILLWAY RELEASES HAVE CHANGED FROM 300 cfs TO 5,000 cfs IN ACCORDANCE WITH THE GUIDE FOR SPILLWAY GATE OPERATIONS IN THE LICENSE APPROVED BY FERC FOR TOLEDO BEND RESERVOIR, CURRENT RELEASES ARE NOTED BELOW: SPILLWAY GATES Number of …
Toledo Bend Reservoir Advisory #2 May 14, 2023
TOLEDO BEND PROJECT JOINT OPERATION 450 Spur 135, Burkeville, TX 75932 59839 Hwy 191, Anacoco, LA 71403 409/565-2273 337/286-5244 (Office) 337286-5253 (Message) ADVISORY #2 DATE: Sunday, May 14, 2023 TOLEDO BEND RESERVOIR – POTENTIAL WATER RELEASES Persons having interests in the Sabine River Basin below the reservoir are hereby advised that on Sunday, May 14, 2023 at 1815 hours, the …
Toledo Bend Reservoir Advisory #1 May 13, 2023
TOLEDO BEND PROJECT JOINT OPERATION 450 Spur 135, Burkeville, TX 75932 59839 Hwy 191, Anacoco, LA 71403 409/565-2273 337/286-5244 (Office) 337/286-5253 (Message) ADVISORY #1 DATE: Saturday, May, 13, 2023 TOLEDO BEND RESERVOIR – OPERATIONS Persons having interests in the Sabine River Basin below the reservoir are hereby advised that on Saturday, May, 13, 2023 at 1215 hours, the reservoir elevation …
RFB 23-0302 LTD Rip Rap Repair
Please download SRA Lake Tawakoni Division Rock RipRap Repair bid documents along with specs and plans at the following link: https://www.sratx.org/about/forms/#doing-business
RFB 23-1207 Pendleton Park PH 2
Please download SRA Toledo Bend Division Pendleton Park Phase II and Addendums at the following link: https://www.sratx.org/about/forms/#doing-business