The Toledo Bend Project Joint Operating (TBPJO) Board will meet on January 5, 2022 at 10:30 AM (local time) at the Sabine River Authority of Texas Administrative Dam site office in Burkeville, Texas. The agenda can be found at the Texas Secretary of State website at the following link: Complete Agenda
Press Release- Lake Fork Reservoir – Soil Cement Repairs
Engineers recommend that the Sabine River Authority of Texas, Lake Fork Division, make minor repairs to the soil cement along the Lake Fork Dam, some of which are currently located underwater. Recent wave action dislodged numerous small sections of the soil cement along the upstream side of the embankment, which protects the earthen portion of the dam. To facilitate these …
RFB 22-0501 Addendum No. 2 TBD Underwater Stump Removal
Please download RFB 22-0501 Addendum No. 2 : https://www.sratx.org/about/forms/#doing-business
TPWD Article: Turtles Return to Texas
Twenty-one adult (and six juvenile) alligator snapping turtles were recently released back into the wild in East Texas after being seized in an illegal wildlife trafficking attempt five years ago. See full article here.
Texas Watershed Steward Workshop
The Texas Watershed Steward program is a free, educational workshop designed to help watershed residents improve and protect their water resources by getting involved in local watershed protection and management activities. The workshop will provide an overview of water quality and watershed management in Texas, including a discussion on the Sabine River basin and local bayous. Pre-register for the workshop …
Addendum 1 Womack Siphon Replacement B883-1023
Download Addendum 1 Womack Siphon Replacement Project here: https://www.sratx.org/about/forms/#doing-business
RFB 22-0501 TBD Underwater Stump Removal
Download Toledo Bend Underwater Stump Removal Addendum No. 1, bid packet, Proposed Cutting Locations, and SRA Vendor Packet here: https://www.sratx.org/about/forms/#doing-business
Womack Siphon Replacement Project Specifications and Documents
Download Womack Siphon Replacement Project specifications, contract documents, and drawings here: https://www.sratx.org/about/forms/#doing-business
Addendum No. 3 Construction of the Lake Tawakoni Tournament Facility Architectural and Utilities
Download Addendum No.3 Construction of the Lake Tawakoni Tournament Facility Architectural and Utilities here: https://www.sratx.org/about/forms/#doing-business
- Page 1 of 2
- 1
- 2