TOLEDO BEND RESERVOIR – WATER RELEASES
AS OF TIME: 15:30 hrs
RESERVOIR ELEV: 172.50 FT. MSL
SPILLWAY RELEASES HAVE CHANGED FROM 300 cfs TO 5,000 cfs
IN ACCORDANCE WITH THE GUIDE FOR SPILLWAY GATE OPERATIONS IN THE LICENSE APPROVED BY FERC FOR TOLEDO BEND RESERVOIR, CURRENT RELEASES ARE NOTED BELOW:
SPILLWAY GATES
Number of Gates | Opened (Feet) |
05 | 01 |
XX | XX |
GENERATORS
Generator # | Current Status |
1 | 24 hrs at 7,357 cfs |
2 | 24 hrs at 6,121cfs |
TOTAL RELEASES
(CFS) | |
SPILLWAY | 5,000 |
GENERATORS | 13,478 |
TOTAL | 18,478 |
Up-to-date reservoir elevations and releases as well as links to specific river gauges may be obtained from SRA’s websites: www.srala-toledo.com , www.sratx.org and www.setexasrain.org. Information on specific river gages can be obtained from the National Weather Service at the following website: http://www.weather.gov/wgrfc and from the USGS at the following websites: http://tx.waterdata.usgs.gov or https://la.waterdata.usgs.gov.
Actual flood conditions may vary significantly from the alert based on new or changed conditions; advanced alerts of changed conditions may not be possible. <TX Leg. HB26